UCHKIR
| Description | Commissioning of 3 compressor units |
| Personnel | Commissioning Engineer |
| Site Location |
Uchkir, Uzbekistan |
| Period | November 2020 – April 2021 |
| Description | Commissioning of 3 compressor units |
| Personnel | Commissioning Engineer |
| Site Location |
Uchkir, Uzbekistan |
| Period | November 2020 – April 2021 |