TAP GREECE
| Description | Commissioning of 3 barrel compressor |
| Personnel | 2 Commissioning Engineer |
| Site Location |
Kipoi, Greece |
| Period | October 2019 – December 2019 |
| Description | Commissioning of 3 barrel compressor |
| Personnel | 2 Commissioning Engineer |
| Site Location |
Kipoi, Greece |
| Period | October 2019 – December 2019 |