AIR LIQUIDE YANGO
| Description | Commissioning of an integrally geared compressor |
| Personnel | Commissioning Engineer |
| Site Location |
Cilegon, Indonesia |
| Period | September 2016 |
| Description | Commissioning of an integrally geared compressor |
| Personnel | Commissioning Engineer |
| Site Location |
Cilegon, Indonesia |
| Period | September 2016 |