ADNOC/BGCP III
| Description | I&C Commissioning of two compressor stations |
| Personnel | I&C Commissioning Engineer |
| Site Location |
Abu Dhabi, United Arab Emirates |
| Period | January 2024 – September 2024 |
| Description | I&C Commissioning of two compressor stations |
| Personnel | I&C Commissioning Engineer |
| Site Location |
Abu Dhabi, United Arab Emirates |
| Period | January 2024 – September 2024 |