TAP ALBANIA
| Description | Commissioning of 3 gasturbines |
| Personnel | Commissioning Engineer |
| Site Location |
Fiere, Albania |
| Period | September 2019 – October 2019 |
| Description | Commissioning of 3 gasturbines |
| Personnel | Commissioning Engineer |
| Site Location |
Fiere, Albania |
| Period | September 2019 – October 2019 |