COARI
| Description | Commissioning of 2 gas turbine driven compressor-units (single shaft) |
| Personnel | Commissioning Engineer |
| Site Location |
Coari, Brazil |
| Period | March 2011 – June 2011 |
| Description | Commissioning of 2 gas turbine driven compressor-units (single shaft) |
| Personnel | Commissioning Engineer |
| Site Location |
Coari, Brazil |
| Period | March 2011 – June 2011 |